ABS Wind Brasil opens the largest test bench for wind turbines in LATAM06/07/2022On May 31, 2022, finally, thanks to a titanic effort of our entire abs wind…
ABS Wind Brasil has successfully completed their first fully loaded test of a repaired wind gearbox for a 2 MW platform03/24/2022Our test bench, located in our Macaiba-RN facilities and with the capacity to run tests…